Roof System — Main Campus
Expiring · 34 days
11-month walkthrough due in 14d
Coverage details
- Vendor
- Tecta America Roofing
- Category
- Roofing — single-ply TPO membrane
- Project
- Westfield Charter Academy · Main Campus
- Term
- 1-year contractor workmanship + 20-year manufacturer (NDL)
- Start
- May 15, 2024
- 1-yr expires
- May 15, 2025 · 34 days remaining
- Coverage value
- $184,000 (roofing scope)
- What's covered
- Workmanship defects, leaks at penetrations, seam separation, flashing failures, manufacturer membrane defects (separate). Excludes punctures from foot traffic, owner-installed equipment, and acts of god.
Warranty timeline · 1-year contractor term
Start · May '24
11-mo · Apr 15
Today
Expires · May 15
Day 338 of 365
11-month window OPEN — schedule walkthrough now
27 days to expiration
Activity log
11-month walkthrough alert triggered — system detected Day 334 of 365
COI document uploaded by Tracy A.
Claim resolved — minor flashing repair at southeast corner
90-day post-completion check completed
Warranty record created from closeout package