Roof System — Main Campus

Expiring · 34 days 11-month walkthrough due in 14d
Coverage details
Vendor
Tecta America Roofing
Category
Roofing — single-ply TPO membrane
Project
Westfield Charter Academy · Main Campus
Term
1-year contractor workmanship + 20-year manufacturer (NDL)
Start
May 15, 2024
1-yr expires
May 15, 2025 · 34 days remaining
Coverage value
$184,000 (roofing scope)
What's covered
Workmanship defects, leaks at penetrations, seam separation, flashing failures, manufacturer membrane defects (separate). Excludes punctures from foot traffic, owner-installed equipment, and acts of god.
Warranty timeline · 1-year contractor term
Start · May '24
11-mo · Apr 15
Today
Expires · May 15
Day 338 of 365 11-month window OPEN — schedule walkthrough now 27 days to expiration
Activity log
11-month walkthrough alert triggered — system detected Day 334 of 365
Apr 14, 2026 · 4 days ago
COI document uploaded by Tracy A.
Jan 4, 2026 · current through May 1, 2026
Claim resolved — minor flashing repair at southeast corner
Nov 22, 2025 · resolved by Tecta America in 9 days
90-day post-completion check completed
Aug 18, 2024
Warranty record created from closeout package
May 18, 2024 · created by Tracy A.